High temperature scenario - photovoltaic power generation and energy storage in East Africa

admin 03/11/2022 1 hits

Project time: March 2022Project location: East AfricaProject composition: 10.436mwh Project signific

Description

3-2

Project time: March 2022

Project location: East Africa

Project composition: 10.436mwh 

Project significance: the solar photovoltaic power station is used in the application scenarios of power preparation, peak shaving and frequency modulation, which can solve the intermittent and fluctuating problems of photovoltaic energy and provide users with stable and continuous power supply.